Q1: How long is your delivery time?
A1: The delivery time depends on your package. Under normal circumstances, the delivery time is 25 - 45 days. Based on the quantity, we will calculate the most reasonable and fastest production and delivery time. Please contact our sales for the most accurate advice.
Q2: What information is required for product quotation?
A2: For product quotation, you need to provide the length, width, height, number of tiers, and load - bearing capacity of the product.
Q3: What products do you export?
A3: Our main export product lines are: Heavy-duty pallet racks, Narrow-aisle racks, Cantilever racks, Double-deep racks, Drive-through racks, Shuttle racks, Steel-structure platform racks, Sliding-type racks, Gravity-flow racks.
Q4: What are the product advantages?
A4: 1. The raw material of the square tube product is made of galvanized base material, and then coated with plastic to provide double protection against rust and surface peeling. The internal galvanization of the square tube eliminates the possibility of internal rusting, extending the service life.
2. The connection between the column and the column shoe is equipped with screw-tightening holes, which can increase the load-bearing capacity or be quickly tightened in case the column shoe is damaged, thus enhancing safety.
3. The column shoes are made of extra-thick SPHC material to increase load-bearing capacity and safety.
Q5: Can you produce according to the customer's design?
A5: Certainly. We have extensive experience in custom-made racks.
Q6: What is the packaging method?
A6: Usually, the racks are flat-packed with bubble wrap/plastic film in standard export cartons. Other packaging such as wooden cases can be provided according to customer requirements.