Jracking Industrial Warehouse Shelves Rack CE Certified Heavy-Duty Cantilever Racking System For Metal Profile Storage

Product Description

Cantilever Racking Overview
Cantilever Racking Details
Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI/CE/ISO/TUV/AS4084-2012
MOQ One 20ft/40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Cantilever rack detail 1
Cantilever rack detail 2
Cantilever rack detail 3
Cantilever racking dimension guide
Installation Instructions
Step 1 installation
Step 1

Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.

Step 2 installation
Step 2

Position the column (1) vertically into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M

Step 3 installation
Step 3

The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.

Step 4 installation
Step 4

The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts(7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use a 14mm bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors(11). Firmly bolt the fastening plate in place. Recommended torque: 50 NM

Step 5 installation
Step 5

The arm (12) is fastened to the column (1) using safety pins 29x140(13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.

Step 6 installation
Step 6

Finally, the completed structure should look like the illustration.

Heavy duty cantilever racking system
Industrial warehouse racking solutions
Storage racking type A
Storage racking type B
Storage racking type C
Warehouse display 1
Warehouse display 2
Warehouse display 3
Loading capacity testing
Various storage systems options
Frequently Asked Questions
What are your trading terms?
  • Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A options are also available.
  • Lead time: Normally 20-25 days after the deposit is received.
  • Sample policy: Samples are available for each model. Ready in 7-15 days once payment is received.
  • Shipping port: Shanghai / Nanjing, China.
  • Discounts: We offer discounts for large volume orders.
How can I arrange delivery of my goods?
  • Sea freight: We will update sea freight estimates once your destination port is confirmed.
  • Client-designated agent: Please provide contact details for your shipping agent, and we will coordinate delivery with them.
What services do you provide?
  • All inquiries related to products or pricing will be answered within 12 hours.
  • Fluent and professional replies from well-trained staff.
  • OEM & ODM design services for custom storage and racking solutions.
  • Experienced engineers to provide tailored technical racking solutions.
What is the purchase process?
Design Drawing → Confirm Drawing → Quotation → PI (Proforma Invoice) → Confirm PI → Arrange 30% Deposit → Manufacturing → QC Inspection → Pay Balance → Shipping
What are your product advantages?
  • Flexible Payment: Option for O/A 40-60 days terms.
  • Lead Time: Fast-track production available for urgent orders.
  • Factory Price: Direct manufacturer sales for highly competitive pricing.
  • Warranty: 2-year product warranty. Any damaged parts will be replaced and shipped to you.
Is there a minimum order quantity (MOQ) limitation?
No strict MOQ limits apply, but larger quantities secure better rates. We recommend a regular order size of at least one 20ft container (approx. 15 tons) to optimize shipping costs.
How is the tooling fee for new molds charged?
If custom tools are required, the mold creation cost is charged before the initial order. This fee is partially or fully refunded once orders reach a pre-agreed volume.

Related Products